Changelog
A better Prevue.
With every update.
New features and improvements to help you get more from your maps.
-
v76
CurrentNew FeatureHubSpot enquiries
Connect your HubSpot account and send new project enquiries to HubSpot as contacts and deals, with delivery status and automatic retries.
-
v75
New FeatureImage fit for each background
Choose how each image background fits the screen: fit width, fit height, show the full image or fill the viewport.
ImprovementLive Google Maps zoom preview
See minimum and maximum zoom limits update on the map as you adjust them, with sliders and a full 0–24 range.
-
v74
New FeatureReconnect Google Sheets by name
Match a Google Sheet to your existing points by name, with a match preview and overwrite confirmation, so images and map placements are kept instead of duplicated.
-
v73
New FeatureCopy and align points
Select groups of points, copy their placements to another image background, move them together and align them horizontally or vertically.
ImprovementSafer bulk removal
Removing a group of placements asks for confirmation and keeps the underlying point data.
-
v72
New FeatureNames on 3D geometry
Show optional name labels on linked 3D model objects, with an availability-colour dot. Turn them on in Map Styling under Labels & leader lines.
-
v71
New FeatureClickable 3D geometry
Link named objects in your 3D model to points, so clicking an apartment or lot opens its information card.
New FeatureAvailability outlines and fills
Front-facing status outlines and fills help visitors see what's available on a 3D model at a glance.
ImprovementCounts in the legend
The availability legend now shows how many points match each status.
ImprovementOptional idle orbit
Slowly orbit the 3D model when visitors stop interacting, then return to the starting view.
-
v70
ImprovementGuided Tour
Added a guided tour for new users with out any projects.
-
v69
UpdateBilling and Accounts
Trial banner hidden when the account has a paid project.
UpdateBilling and Accounts
Project banner shows the plan and paid-through date, with a Settings button.
-
v68
New FeatureLot depth and filtering
Display lot depth beside frontage with matching measurement icons, and narrow search results using the new Depth filter.
ImprovementFaster point entry
Press Enter while typing a point’s name to add a new row and jump straight into naming it.
-
v67
New FeatureText labels and leader lines
Add written labels and optional leader lines to information points across image, Google Maps and 3D backgrounds.
New FeatureHide points behind 3D models
Automatically hide viewer icons and labels when model geometry blocks them from view.
-
v66
New FeatureFullscreen image lightbox
Click popup images to enlarge them and browse using previous and next arrows.
ImprovementClearer image upload feedback
See individual upload placeholders and retry unsuccessful uploads.
-
v65
New FeatureClose unpaid checkouts
Close an abandoned checkout directly from your project’s billing controls.
Bug FixDelete projects after abandoned checkout
Remove projects previously blocked by an unpaid checkout while retaining protection for active subscriptions.
-
v64
ImprovementEnquiries moved to Analytics
Find your project enquiries alongside visitor activity and engagement.
New FeatureDelete individual enquiries
Remove unwanted or test enquiries with a confirmation before deletion.
-
v63
New FeatureReset project analytics
Clear testing activity from an individual project before launching your map.
ImprovementKeep enquiries when resetting
Reset visitor analytics while preserving your enquiries and project content.
-
v62
Bug FixRecognise existing transfer recipients
Fixed an issue preventing transfers to users who had already signed up and logged in.
ImprovementMore accurate recipient checks
Project transfers now look up recipients using active accounts.
-
v61
ImprovementCleaner project settings
Removed the inactive HubSpot enquiries section from project settings.
ImprovementReduced setup confusion
Hidden unused integration controls so users can focus on available settings.
